Kofi E. Ampaabeng
Research

Research project

Ghana's unfinished public projects

Which of Ghana's public projects stand unfinished, stalled or abandoned: what did each cost, what was paid, what stands today, and does it operate?

Status
Collecting
Last update
2026-11-14

Findings so far

No findings yet: the register has published no release.

Method

A sourced register. Each project is one record; every claim about it (a contract sum, a payment, its physical state, whether it operates) is a separate dated observation with its source, the page it comes from and an evidence tag: FACT, FUNDED, ANNOUNCED or REPEATED. Physical completion and operation are separate claims, and claims that disagree sit side by side. Money keeps the currency the source gives. The records are validated before each dated release, and a release is never edited: a correction is a new release.

Sources

Log

  1. Literature review and source map: what research has measured, and the public data series that list projects with their cost, payments and state.
  2. Record schema settled: projects, dated observations and sources, with a validator that refuses a claim without a source, a date or an evidence tag.

Data

The register

5 of 5

ProjectSectorRegionDistrictPhysical stateOperatingContract sumFunders
Agenda 111healthmultiplein progress (2026-07-09)not operating (2026-07-09)Government of Ghana
Kpone Affordable Housing ProjecthousingGreater AccraKpone Katamanso Municipalityin progress (2026-04-15)partly operating (2026-04-15)
Saglemi Affordable Housing ProjecthousingGreater AccraNingo Prampram Municipalityin progress (2026-08-20)not operating (2026-08-20)USD 200,000,000 (2013-01-04)Credit Suisse International
Tema-Mpakadan Railway Linerailmultiplein progress (2026-07-06)unknown (2026-07-06)USD 447,000,000 (2025-05-20)Export-Import Bank of India, European Union (signalling grant)
Weija Children's HospitalhealthGreater AccraWeija-Gbawe Municipalityin progress (2026-10-03)partly operating (2026-10-03)USD 10,150,000 (2026-05-25)World Bank

Source: Ghana's unfinished public projects, release 2026-11-14 (as of 2026-11-14), CC BY 4.0.

Projects by sector
  • health2
  • housing2
  • rail1
Table
Projects by sector
SectorProjects
health2
housing2
rail1

Source: Ghana's unfinished public projects, release 2026-11-14 (as of 2026-11-14), CC BY 4.0.

Projects by funder
  • Credit Suisse International1
  • European Union (signalling grant)1
  • Export-Import Bank of India1
  • Government of Ghana1
  • not stated1
  • World Bank1
Table
Projects by funder
FunderProjects
Credit Suisse International1
European Union (signalling grant)1
Export-Import Bank of India1
Government of Ghana1
not stated1
World Bank1

Source: Ghana's unfinished public projects, release 2026-11-14 (as of 2026-11-14), CC BY 4.0.

Projects by region
  • Greater Accra3
  • multiple2
Table
Projects by region
RegionProjects
Greater Accra3
multiple2

Source: Ghana's unfinished public projects, release 2026-11-14 (as of 2026-11-14), CC BY 4.0.

Dated claims per project

FACTFUNDEDANNOUNCEDREPEATED

Agenda 111 · 9 claims2026-07-09 · allegation: Some Agenda 111 hospitals were commissioned with temporary arrangements: generators were brought for the ceremony and removed afterwards, and the premises were locked. · ANNOUNCED · MyJoyOnline2026-07-09 · amount outstanding: GHS 1,000,000,000 · FACT · MyJoyOnline2026-07-09 · amount paid: GHS 4,800,000,000 · FACT · MyJoyOnline2026-07-09 · announcement: 35 Agenda 111 projects identified for continuation; contractors directed to return to site; no completion dates given because some contracts may be terminated and repackaged. · ANNOUNCED · MyJoyOnline2026-07-09 · announcement: The 2026 Budget provides for work to start on 10 of the 35 identified projects. · FUNDED · MyJoyOnline2026-07-09 · announcement: Church or CHAG partners may complete, equip and operate Agenda 111 facilities under agreements with the Ministry. · ANNOUNCED · Citi Newsroom2026-07-09 · cost to complete: GHS 20,000,000,000 · ANNOUNCED · Citi Newsroom2026-07-09 · operational state: not operating · FACT · MyJoyOnline2026-07-09 · physical state: in progress · FACT · MyJoyOnline

2026-07-092026-07-09

Claims about Agenda 111
As ofClaimTagSource
2026-07-09allegation: Some Agenda 111 hospitals were commissioned with temporary arrangements: generators were brought for the ceremony and removed afterwards, and the premises were locked. (stated by Health Minister (statement to Parliament's Assurance Committee))in some cases, generators were carried to the site for the commissioning, and after the commissioning, it was taken back, and the place was locked.ANNOUNCEDMyJoyOnline, article paragraph 16
2026-07-09amount outstanding: GHS 1,000,000,000 (stated by Health Minister (statement to Parliament's Assurance Committee))the government inherited more than GH¢1 billion in outstanding Interim Payment Certificates (IPCs) owed to contractorsFACTMyJoyOnline, article paragraph 2
2026-07-09amount paid: GHS 4,800,000,000 (stated by Health Minister (statement to Parliament's Assurance Committee))despite the previous administration spending about GH¢4.8 billion on the initiativeFACTMyJoyOnline, article paragraph 1
2026-07-09announcement: 35 Agenda 111 projects identified for continuation; contractors directed to return to site; no completion dates given because some contracts may be terminated and repackaged. (stated by Health Minister (statement to Parliament's Assurance Committee))the government has identified 35 Agenda 111 projects for continuation, with contractors directed to return to their respective sites.ANNOUNCEDMyJoyOnline, article paragraph 3
2026-07-09announcement: The 2026 Budget provides for work to start on 10 of the 35 identified projects. (stated by Health Minister (statement to Parliament's Assurance Committee))if you check the 2026 Budget, we said we were going to start 10 in 2026.FUNDEDMyJoyOnline, article paragraph 7
2026-07-09announcement: Church or CHAG partners may complete, equip and operate Agenda 111 facilities under agreements with the Ministry. (stated by Health Minister (statement to Parliament's Assurance Committee))if any church is interested in any of the Agenda 111 facilities, we will enter into an agreement with the church or CHAG and they will finish, equip and then operationalise itANNOUNCEDCiti Newsroom, article paragraph 8
2026-07-09cost to complete: GHS 20,000,000,000 (stated by Health Minister (statement to Parliament's Assurance Committee))We need a little above 20 billion Ghana cedis.ANNOUNCEDCiti Newsroom, article paragraph 4
2026-07-09operational state: not operating (stated by Health Minister (statement to Parliament's Assurance Committee))the Minister answered, "Zero."FACTMyJoyOnline, article paragraph 12
2026-07-09physical state: in progress (stated by Health Minister (statement to Parliament's Assurance Committee))About three were commissioned, while they were not completed.FACTMyJoyOnline, article paragraph 14
Kpone Affordable Housing Project · 11 claims2024-11-26 · allegation: The project was abandoned between 2009 and 2016 and was revived by the new board and management of the Tema Development Corporation. · ANNOUNCED · Graphic Online2024-11-26 · capacity: 1072 units · FACT · Graphic Online2024-11-26 · capacity: 832 units · ANNOUNCED · Graphic Online2024-11-26 · commissioning date: 2024-11 · FACT · Graphic Online2024-11-26 · start date: 2006 · ANNOUNCED · Graphic Online2026-04-15 · announcement: Contracts under the project could be terminated over poor performance; one contractor responsible for 10 blocks is significantly behind schedule. · ANNOUNCED · Graphic Online2026-04-15 · capacity: 800 units · ANNOUNCED · Graphic Online2026-04-15 · completion date planned: 2026-09 · ANNOUNCED · Graphic Online2026-04-15 · operational state: partly operating · FACT · Graphic Online2026-04-15 · physical progress: 90% · FACT · Information Services Department2026-04-15 · physical state: in progress · FACT · Graphic Online

2024-11-262026-04-15

Claims about Kpone Affordable Housing Project
As ofClaimTagSource
2024-11-26allegation: The project was abandoned between 2009 and 2016 and was revived by the new board and management of the Tema Development Corporation. (stated by Vice-President (speech at the inauguration and sod-cutting))was abandoned between 2009 and 2016ANNOUNCEDGraphic Online, article paragraph 4
2024-11-26capacity: 1072 units (stated by Graphic Online (reporter))inaugurated a 1,072 housing units part of the Kpone (Community 26) affordable housing facilityFACTGraphic Online, article paragraph 3
2024-11-26capacity: 832 units (stated by Vice-President (speech at the inauguration and sod-cutting))cut the sod for the construction of 832 additional housing units at KponeANNOUNCEDGraphic Online, article paragraph 1
2024-11-26commissioning date: 2024-11 (stated by Graphic Online (reporter))inaugurated a 1,072 housing units part of the Kpone (Community 26) affordable housing facilityFACTGraphic Online, article paragraph 3
2024-11-26start date: 2006 (stated by Vice-President (speech at the inauguration and sod-cutting))started in 2006ANNOUNCEDGraphic Online, article paragraph 4
2026-04-15announcement: Contracts under the project could be terminated over poor performance; one contractor responsible for 10 blocks is significantly behind schedule. (stated by Managing Director, TDC Ghana Ltd)warned contractors under the Kpone Affordable Housing Project that contracts could be terminated over poor performanceANNOUNCEDGraphic Online, article paragraph 17
2026-04-15capacity: 800 units (stated by Minister for Works, Housing and Water Resources)the significant progress made on the 800 two-bedroom housing units under Phase Four of the Kpone Affordable Housing ProjectANNOUNCEDGraphic Online, article paragraph 4
2026-04-15completion date planned: 2026-09 (stated by Minister for Works, Housing and Water Resources)which is expected to be completed by September this yearANNOUNCEDGraphic Online, article paragraph 4
2026-04-15operational state: partly operating (stated by Minister for Works, Housing and Water Resources)Already, Phases One to Three of the project have delivered 1,000 housing units.FACTGraphic Online, article paragraph 8
2026-04-15physical progress: 90% (stated by Information Services Department, reporting the Minister's inspection)Work on both phases, which commenced in 2025, is now 90% complete.FACTInformation Services Department, article paragraph 2
2026-04-15physical state: in progress (stated by Graphic Online (reporter, on the Minister's inspection))Construction, which began in 2025, has reached advanced stages, with several buildings currently at roofing, plastering and painting levels.FACTGraphic Online, article paragraph 5
Saglemi Affordable Housing Project · 20 claims2012-08 · capacity: 5000 units · FACT · MyJoyOnline2013-01-04 · award date: 2013-01-04 · FACT · MyJoyOnline2013-01-04 · contract sum: USD 200,000,000 · FACT · MyJoyOnline2013-01-04 · loan amount: USD 200,000,000 · FACT · MyJoyOnline2016-12-21 · capacity: 1412 units · FACT · MyJoyOnline2016-12-21 · completion date planned: 2017-07-31 · ANNOUNCED · MyJoyOnline2016-12-21 · revised contract sum: USD 181,018,000 · FACT · MyJoyOnline2021-08-01 · allegation: The contractor was paid US$179.9m although the cost of works executed on site, including consultancy services, was about US$64.98m; only 668 housing units were completed, none habitable or sold, and the facility remains unpaid. · ANNOUNCED · MyJoyOnline2021-08 · amount paid: USD 179,904,757.78 · ANNOUNCED · MyJoyOnline2021-08 · amount paid: USD 196,428,891.66 · ANNOUNCED · MyJoyOnline2021-08-01 · capacity: 668 units · ANNOUNCED · MyJoyOnline2021-08-01 · operational state: not operating · ANNOUNCED · MyJoyOnline2025 · physical state: stalled · ANNOUNCED · MyJoyOnline2025-02-07 · decision: The Attorney-General withdrew all charges in the Saglemi case against the five accused by a nolle prosequi notice filed at the High Court (Financial Division 1) on 7 February 2025. · FACT · Citi Newsroom2026-08-20 · allegation: The stalled site was vandalised: cables, wash basins, baths, fittings and bulbs were stolen, and underground telecommunications cables removed. · ANNOUNCED · MyJoyOnline2026-08-20 · completion date planned: 2027-03 · ANNOUNCED · MyJoyOnline2026-08-20 · completion date planned: 2027-12 · ANNOUNCED · MyJoyOnline2026-08-20 · operational state: not operating · ANNOUNCED · MyJoyOnline2026-08-20 · physical state: in progress · ANNOUNCED · MyJoyOnline2026-08-24 · announcement: Work is to begin immediately on a further 3,500 units, to bring the estate to the 5,000 units originally planned. · ANNOUNCED · Ghanaian Times

2012-082026-08-24

Claims about Saglemi Affordable Housing Project
As ofClaimTagSource
2012-08capacity: 5000 units (stated by Attorney-General (court filing, as reported by MyJoyOnline))granted executive approval to the Ministry of Water Resources, Works and Housing (MWRWH) for the construction of 5000 affordable housing units (the Saglemi Affordable Housing Project)FACTMyJoyOnline, article paragraph 8
2013-01-04award date: 2013-01-04 (stated by Attorney-General (court filing, as reported by MyJoyOnline))signed an Engineering, Procurement and Construction (EPC) Agreement with Construtora OAS Ghana LtdFACTMyJoyOnline, article paragraph 12
2013-01-04contract sum: USD 200,000,000 (stated by Attorney-General (court filing, as reported by MyJoyOnline))at a contract price of US$ 200million, including consultancy servicesFACTMyJoyOnline, article paragraph 13
2013-01-04loan amount: USD 200,000,000 (stated by Attorney-General (court filing, as reported by MyJoyOnline))On 4th January 2013, a Facility Agreement was signed between the Ministry of Finance, as the borrower, and Credit Suisse, as the creditor, for a facility of $200million for the construction of 5000 housing units.FACTMyJoyOnline, article paragraph 11
2016-12-21capacity: 1412 units (stated by Attorney-General (court filing, as reported by MyJoyOnline))further reduction in the scope of works to 1,412 housing unitsFACTMyJoyOnline, article paragraph 32
2016-12-21completion date planned: 2017-07-31 (stated by Attorney-General (court filing, as reported by MyJoyOnline))extended the completion period of the contract to 31st July 2017 without any basisANNOUNCEDMyJoyOnline, article paragraph 32
2016-12-21revised contract sum: USD 181,018,000 (stated by Attorney-General (court filing, as reported by MyJoyOnline))revised contract price of US$ l81,018,000.00 and extended the completion period of the contract to 31st July 2017FACTMyJoyOnline, article paragraph 32
2021-08-01allegation: The contractor was paid US$179.9m although the cost of works executed on site, including consultancy services, was about US$64.98m; only 668 housing units were completed, none habitable or sold, and the facility remains unpaid. (stated by Attorney-General (court filing))investigations revealed that the cost of works executed on the site, including consultancy services, is about $64,982,900.77.ANNOUNCEDMyJoyOnline, article paragraph 37
2021-08amount paid: USD 179,904,757.78 (stated by Attorney-General (court filing, as reported by MyJoyOnline))with the contractor having been paid $179,904, 757.78ANNOUNCEDMyJoyOnline, article paragraph 37
2021-08amount paid: USD 196,428,891.66 (stated by Attorney-General (court filing, as reported by MyJoyOnline))Even though a total amount of $196,428,891.66 has been spent on the Saglemi Affordable Housing ProjectANNOUNCEDMyJoyOnline, article paragraph 37
2021-08-01capacity: 668 units (stated by Attorney-General (court filing, as reported by MyJoyOnline))Investigations further revealed that only 668 housing units were completed by the contractor.ANNOUNCEDMyJoyOnline, article paragraph 38
2021-08-01operational state: not operating (stated by Attorney-General (court filing, as reported by MyJoyOnline))These houses are, however, not habitable and none under the project has been sold and the Facility remains unpaidANNOUNCEDMyJoyOnline, article paragraph 39
2025physical state: stalled (stated by President (Presidency statement and site tour, 20 August 2026))before it stalled following a change of government and subsequent legal and investigative issuesANNOUNCEDMyJoyOnline, article paragraph 5
2025-02-07decision: The Attorney-General withdrew all charges in the Saglemi case against the five accused by a nolle prosequi notice filed at the High Court (Financial Division 1) on 7 February 2025. (stated by Attorney-General (nolle prosequi notice))The notice, signed by the Attorney-General, officially marks the end of the state's case against the accused individuals.FACTCiti Newsroom, article paragraph 3
2026-08-20allegation: The stalled site was vandalised: cables, wash basins, baths, fittings and bulbs were stolen, and underground telecommunications cables removed. (stated by President (Presidency statement and site tour, 20 August 2026))Looters came in and stole everything, the cables, the wash basins, the baths, all the fittings, electrical bulbsANNOUNCEDMyJoyOnline, article paragraph 8
2026-08-20completion date planned: 2027-03 (stated by President (Presidency statement and site tour, 20 August 2026))the first 700 housing units at the Saglemi Affordable Housing Project are expected to be completed and commissioned by March 2027ANNOUNCEDMyJoyOnline, article paragraph 1
2026-08-20completion date planned: 2027-12 (stated by President (Presidency statement and site tour, 20 August 2026))1,500 housing units to be completed by the end of 2027ANNOUNCEDMyJoyOnline, article paragraph 2
2026-08-20operational state: not operating (stated by MyJoyOnline (reporter))prospective homeowners to prepare to register for the houses once the official registration portal is opened.ANNOUNCEDMyJoyOnline, article paragraph 4
2026-08-20physical state: in progress (stated by MyJoyOnline (reporter, on the President's tour))where construction work is ongoing to complete the residential communityANNOUNCEDMyJoyOnline, article paragraph 3
2026-08-24announcement: Work is to begin immediately on a further 3,500 units, to bring the estate to the 5,000 units originally planned. (stated by President (working tour of Saglemi))while work would begin immediately on the additional 3,500 units to bring the estate to the 5,000 units originally envisagedANNOUNCEDGhanaian Times, article paragraph 3
Tema-Mpakadan Railway Line · 11 claims2025-05-20 · announcement: About 75 per cent of the vandalism and theft damage has been repaired; commercial operations were held back by theft and vandalism and by the absence of private operators. · ANNOUNCED · Graphic Online2025-05-20 · announcement: Full commercial operations could begin by 20 June 2026. · ANNOUNCED · Graphic Online2025-05-20 · capacity: 97.7 km · FACT · Graphic Online2025-05-20 · commissioning date: 2024-11-22 · FACT · Graphic Online2025-05-20 · operational state: not operating · ANNOUNCED · Graphic Online2025-05-20 · physical state: completed · ANNOUNCED · Graphic Online2025-05-20 · total cost: USD 447,000,000 · ANNOUNCED · Graphic Online2025-10-01 · operational state: partly operating · FACT · Graphic Online2026-07-06 · grant amount: USD 21,000,000 · FUNDED · Citi Newsroom2026-07-06 · operational state: unknown · ANNOUNCED · Citi Newsroom2026-07-06 · physical state: in progress · ANNOUNCED · Citi Newsroom

2025-05-202026-07-06

Claims about Tema-Mpakadan Railway Line
As ofClaimTagSource
2025-05-20announcement: About 75 per cent of the vandalism and theft damage has been repaired; commercial operations were held back by theft and vandalism and by the absence of private operators. (stated by Acting Chief Executive Officer, Ghana Railway Development Authority)about 75 per cent of the damage has so far been repairedANNOUNCEDGraphic Online, article paragraph 8
2025-05-20announcement: Full commercial operations could begin by 20 June 2026. (stated by Acting Chief Executive Officer, Ghana Railway Development Authority)full commercial operations could begin by June 20, 2026.ANNOUNCEDGraphic Online, article paragraph 13
2025-05-20capacity: 97.7 km (stated by Graphic Online (reporter))Six months after the official opening of the 97.7-kilometre Tema-Mpakadan railway operations on Friday, November 22, 2024, the much-publicised service remains inactiveFACTGraphic Online, article paragraph 1
2025-05-20commissioning date: 2024-11-22 (stated by Graphic Online (reporter))Six months after the official opening of the 97.7-kilometre Tema-Mpakadan railway operations on Friday, November 22, 2024, the much-publicised service remains inactiveFACTGraphic Online, article paragraph 1
2025-05-20operational state: not operating (stated by Graphic Online (reporter))Six months after the official opening of the 97.7-kilometre Tema-Mpakadan railway operations on Friday, November 22, 2024, the much-publicised service remains inactiveANNOUNCEDGraphic Online, article paragraph 1
2025-05-20physical state: completed (stated by Graphic Online (reporter))Constructed at a cost of US$447 million through a credit facility from the India Export-Import BankANNOUNCEDGraphic Online, article paragraph 3
2025-05-20total cost: USD 447,000,000 (stated by Graphic Online (reporter, no document cited))Constructed at a cost of US$447 million through a credit facility from the India Export-Import BankANNOUNCEDGraphic Online, article paragraph 3
2025-10-01operational state: partly operating (stated by Graphic Online (reporter))The Ghana Railways Development Authority (GRDA) on Wednesday, October 1, 2025, reactivated commercial operations on the Tema-Mpakadan railway line.FACTGraphic Online, article paragraph 1
2026-07-06grant amount: USD 21,000,000 (stated by Chief Executive Officer, Ghana Railway Development Authority)we have been awarded 21 million US dollars by the EU Commission as a grant to fix the signalling system with ETCS Level 1FUNDEDCiti Newsroom, article paragraph 8
2026-07-06operational state: unknown (stated by Citi Newsroom (reporter))following concerns about its readiness for full commercial operationANNOUNCEDCiti Newsroom, article paragraph 1
2026-07-06physical state: in progress (stated by Ghana Railway Development Authority (press briefing, as reported by Citi Newsroom))a forensic audit conducted under the current administration revealed that several essential systems on the line were either incomplete or not functional at the time of its commissioningANNOUNCEDCiti Newsroom, article paragraph 2
Weija Children's Hospital · 26 claims2025-12-12 · allegation: The World Bank cancelled the construction contract, stopping work; the cancellation is said to rest on price inconsistencies, no Public Procurement Authority approval and no value-for-money audit. · ANNOUNCED · MyJoyOnline2025-12-12 · announcement: No notice of termination or cancellation has been received; the contract is with the Ministry of Health, not the World Bank; the only outstanding issue is payments due from the Ministry; the contractor gave no interview to any media house. · ANNOUNCED · MyJoyOnline2025-12-12 · physical progress: 65% · ANNOUNCED · MyJoyOnline2025-12-12 · physical state: stalled · ANNOUNCED · MyJoyOnline2025-12-12 · physical state: in progress · ANNOUNCED · MyJoyOnline2025-12-12 · total cost: USD 14,000,000 · ANNOUNCED · MyJoyOnline2025-12-16 · announcement: The World Bank project (P173788) closed on 16 December 2025 after a six-month extension. · FACT · MyJoyOnline2025-12-16 · physical state: in progress · FACT · MyJoyOnline2026-05-06 · allegation: In 2024 the World Bank raised concerns about misprocurement, including medical equipment priced up to about 11 times the actual price, and declined to settle all outstanding payments. · ANNOUNCED · Adomonline2026-05-06 · allegation: The contractor halted the Ministry's preparations to commission the hospital, insisting that all outstanding issues be resolved before it granted access. · ANNOUNCED · Adomonline2026-05-06 · completion date planned: 2025-12 · ANNOUNCED · Adomonline2026-05-06 · operational state: not operating · ANNOUNCED · Adomonline2026-05-06 · start date: 2023 · FACT · Adomonline2026-05-25 · capacity: 120 beds · FACT · MyJoyOnline2026-05-25 · operational state: not operating · FACT · MyJoyOnline2026-05-25 · total cost: USD 10,150,000 · FACT · MyJoyOnline2026-07-08 · allegation: In the course of construction the World Bank raised issues of misprocurement. · ANNOUNCED · MyJoyOnline2026-07-08 · announcement: The Ministry will commission the hospital within 24 hours of handover, with the full complement of staff on standby. · ANNOUNCED · MyJoyOnline2026-07-08 · operational state: not operating · ANNOUNCED · MyJoyOnline2026-07-08 · physical state: in progress · ANNOUNCED · MyJoyOnline2026-07-16 · physical state: completed · ANNOUNCED · Citi Newsroom2026-08-07 · announcement: The contractor handed the hospital over to the Ministry of Health on 7 August 2026, monitored by EOCO. EOCO's investigations into alleged procurement breaches and financial impropriety on the project remain ongoing. · FACT · MyJoyOnline2026-08-11 · capacity: 130 beds · ANNOUNCED · MyJoyOnline2026-10-03 · announcement: Ten additional doctors and 30 nurses and midwives are to be deployed to the hospital with immediate effect. · ANNOUNCED · MyJoyOnline2026-10-03 · operational state: partly operating · FACT · MyJoyOnline2026-10-03 · physical state: in progress · FACT · MyJoyOnline

2025-12-122026-10-03

Claims about Weija Children's Hospital
As ofClaimTagSource
2025-12-12allegation: The World Bank cancelled the construction contract, stopping work; the cancellation is said to rest on price inconsistencies, no Public Procurement Authority approval and no value-for-money audit. (stated by MyJoyOnline (reporter, relaying concerned residents and activists))The cancellation of the project is said to be due to price inconsistencies, lack of approval from the Public Procurement Authority (PPA), and the lack of a value for money audit, among others.ANNOUNCEDMyJoyOnline, article paragraph 3
2025-12-12announcement: No notice of termination or cancellation has been received; the contract is with the Ministry of Health, not the World Bank; the only outstanding issue is payments due from the Ministry; the contractor gave no interview to any media house. (stated by Awerco Construction Limited (press release dated 12 December 2025, signed by its Managing Director))there has been no notice whatsoever of contract termination or cancellationANNOUNCEDMyJoyOnline, article paragraph 5
2025-12-12physical progress: 65% (stated by MyJoyOnline, attributing the figure to the contractor on site (Awerco Construction Limited))The new 120-bed facility valued at $14 million is already 65% complete, according to the contractor on the siteANNOUNCEDMyJoyOnline, article paragraph 5
2025-12-12physical state: stalled (stated by MyJoyOnline (reporter, relaying activists and residents))has stalled due to an alleged unilateral abrogation of the contract for its construction by the funding agencyANNOUNCEDMyJoyOnline, article paragraph 1
2025-12-12physical state: in progress (stated by Awerco Construction Limited (press release dated 12 December 2025))the Weija Paediatric Hospital Project is practically completed in line with the contract scope and is currently undergoing snagging works in collaboration with the Ministry of Health.ANNOUNCEDMyJoyOnline, article paragraph 3
2025-12-12total cost: USD 14,000,000 (stated by MyJoyOnline (reporter, no document cited))The new 120-bed facility valued at $14 million is already 65% complete, according to the contractor on the siteANNOUNCEDMyJoyOnline, article paragraph 5
2025-12-16announcement: The World Bank project (P173788) closed on 16 December 2025 after a six-month extension. (stated by World Bank (statement of 25 May 2026))the project officially closed on December 16, 2025, after a six-month extensionFACTMyJoyOnline, article paragraph 4
2025-12-16physical state: in progress (stated by World Bank (statement of 25 May 2026))several components of the project remained unfinished, including the installation of some medical equipmentFACTMyJoyOnline, article paragraph 7
2026-05-06allegation: In 2024 the World Bank raised concerns about misprocurement, including medical equipment priced up to about 11 times the actual price, and declined to settle all outstanding payments. (stated by Ministry of Health spokesperson)in 2024, the World Bank raised concerns about misprocurement, which included inflated costs of medical equipment—up to about 11 times the actual price.ANNOUNCEDAdomonline, article paragraph 5
2026-05-06allegation: The contractor halted the Ministry's preparations to commission the hospital, insisting that all outstanding issues be resolved before it granted access. (stated by Ministry of Health spokesperson)the contractor subsequently halted this process, insisting that all outstanding issues be fully resolved before granting access to the hospital.ANNOUNCEDAdomonline, article paragraph 9
2026-05-06completion date planned: 2025-12 (stated by Ministry of Health spokesperson)The hospital is a World Bank-funded project, which commenced in 2023 and was expected to be completed in December 2025ANNOUNCEDAdomonline, article paragraph 3
2026-05-06operational state: not operating (stated by Ministry of Health spokesperson)Despite efforts to make the facility operational, the process was halted.ANNOUNCEDAdomonline, article paragraph 8
2026-05-06start date: 2023 (stated by Ministry of Health spokesperson)The hospital is a World Bank-funded project, which commenced in 2023 and was expected to be completed in December 2025FACTAdomonline, article paragraph 3
2026-05-25capacity: 120 beds (stated by World Bank (statement of 25 May 2026))the 120-bed specialised paediatric hospital at Weija was built and equipped under the World Bank-funded COVID-19 Emergency Preparedness and Response Project at a total cost of US$10.15 millionFACTMyJoyOnline, article paragraph 2
2026-05-25operational state: not operating (stated by World Bank (statement of 25 May 2026))To fully operationalise the hospital, the Government will need to complete these necessary actions and assign staff to the facilityFACTMyJoyOnline, article paragraph 12
2026-05-25total cost: USD 10,150,000 (stated by World Bank (statement of 25 May 2026))the 120-bed specialised paediatric hospital at Weija was built and equipped under the World Bank-funded COVID-19 Emergency Preparedness and Response Project at a total cost of US$10.15 millionFACTMyJoyOnline, article paragraph 2
2026-07-08allegation: In the course of construction the World Bank raised issues of misprocurement. (stated by Health Minister (statement to Parliament, 8 July 2026))the World Bank raised issues of what we call misprocurementANNOUNCEDMyJoyOnline, article paragraph 5
2026-07-08announcement: The Ministry will commission the hospital within 24 hours of handover, with the full complement of staff on standby. (stated by Health Minister (statement to Parliament, 8 July 2026))if the project is handed over this morning, within the next 24 hours, we don't even need any fanfare. We will commission the project because we have the full complement of staff for that particular facilityANNOUNCEDMyJoyOnline, article paragraph 11
2026-07-08operational state: not operating (stated by Health Minister (statement to Parliament, 8 July 2026))the hospital cannot begin operations because some critical components, including the installation of medical equipment, are yet to be completedANNOUNCEDMyJoyOnline, article paragraph 3
2026-07-08physical state: in progress (stated by Health Minister (statement to Parliament, 8 July 2026))the contractor’s inability to complete outstanding works and officially hand over the facility to the MinistryANNOUNCEDMyJoyOnline, article paragraph 1
2026-07-16physical state: completed (stated by Economic and Organised Crime Office (statement dated 16 July 2026, as reported by Citi Newsroom))The parties agreed that the completed facility should be handed over and made operational without further delay, in the interest of the public.ANNOUNCEDCiti Newsroom, article paragraph 3
2026-08-07announcement: The contractor handed the hospital over to the Ministry of Health on 7 August 2026, monitored by EOCO. EOCO's investigations into alleged procurement breaches and financial impropriety on the project remain ongoing. (stated by Economic and Organised Crime Office (statement of 11 August 2026, as reported by MyJoyOnline))The handover ceremony, monitored by the Economic and Organised Crime Office (EOCO), took place on August 7, 2026, at the Conference Room of the Weija Paediatric Hospital.FACTMyJoyOnline, article paragraph 2
2026-08-11capacity: 130 beds (stated by Economic and Organised Crime Office (as reported by MyJoyOnline))has handed over the 130-bed facility to the Ministry of HealthANNOUNCEDMyJoyOnline, article paragraph 1
2026-10-03announcement: Ten additional doctors and 30 nurses and midwives are to be deployed to the hospital with immediate effect. (stated by Health Minister (announcement after an inspection))I have directed that with immediate effect, they should bring an additional 10 medical doctors and 30 nurses and midwives to beef up the health workforce.ANNOUNCEDMyJoyOnline, article paragraph 8
2026-10-03operational state: partly operating (stated by Health Minister (announcement after an inspection))The Weija Children’s Specialist Hospital is now operational, with the 120-bed facility providing outpatient and emergency servicesFACTMyJoyOnline, article paragraph 1
2026-10-03physical state: in progress (stated by Health Minister (announcement after an inspection))almost all the equipment required for the facility had been installedFACTMyJoyOnline, article paragraph 6

Source: Ghana's unfinished public projects, release 2026-11-14 (as of 2026-11-14), CC BY 4.0.

Quote text is the work of its source, reproduced with its citation for research and comment. It is left out for every source whose quote_policy is omit.

Projects by district
Adenta Municipal: 0 projectsLedzokuku Municipal: 0 projectsChereponi: 0 projectsWa East: 0 projectsWa Municipal: 0 projectsSaboba: 0 projectsJirapa: 0 projectsGushegu: 0 projectsSissala West: 0 projectsNanumba North: 0 projectsLambussie-karni: 0 projectsBolgatanga Municipal: 0 projectsNanumba South: 0 projectsWenchi Municipal: 0 projectsBongo: 0 projectsTano South Municipal: 0 projectsKasena Nankana West: 0 projectsWa West: 0 projectsSunyani Municipal: 0 projectsSawla-tuna-kalba: 0 projectsAsante Akim South: 0 projectsSissala East: 0 projectsAda East: 0 projectsShai Osudoku: 0 projectsKasena Nankana East: 0 projectsAda West: 0 projectsBunkpurugu Nakpanduri: 0 projectsGaru: 0 projectsNingo/prampram: 1 projectEast Mamprusi: 0 projectsLa Dade-kotopon: 0 projectsBawku West: 0 projectsAowin: 0 projectsDormaa East: 0 projectsSuaman: 0 projectsBerekum East Municipal: 0 projectsBia East: 0 projectsJaman South Municipal: 0 projectsBia West: 0 projectsSunyani West: 0 projectsAsunafo North Municipal: 0 projectsBodi: 0 projectsJuaboso: 0 projectsNkoranza North: 0 projectsKintampo South: 0 projectsShama: 0 projectsTano North Municipal: 0 projectsWassa East: 0 projectsKetu North: 0 projectsMpohor: 0 projectsWassa Amenfi West: 0 projectsKetu South: 0 projectsWassa Amenfi Central: 0 projectsKeta Municipal: 0 projectsKadjebi: 0 projectsMfantseman Municipal: 0 projectsSouth Tongu: 0 projectsEkumfi: 0 projectsTwifo Hemang Lower Denkyira: 0 projectsJasikan: 0 projectsTwifo Atti-morkwa: 0 projectsKrachi East Municipal: 0 projectsAwutu Senya: 0 projectsNkwanta South Municipal: 0 projectsAwutu Senya East: 0 projectsAfigya Kwabre South: 0 projectsLa-nkwantanang-madina: 0 projectsAtwima Kwanwoma: 0 projectsSekyere South: 0 projectsGa East: 0 projectsAyawaso West: 0 projectsSekyere East: 0 projectsGa South Municipal: 0 projectsGa West Municipal: 0 projectsSekyere Central: 0 projectsGa Central Municipal: 0 projectsOffinso North: 0 projectsKrachi West: 0 projectsOffinso Municipal: 0 projectsObuasi Municipal: 0 projectsKrachi Nchumuru: 0 projectsKwabre East: 0 projectsAgotime Ziope: 0 projectsAdaklu: 0 projectsEjura-sekyedumase: 0 projectsAtwima Nwabiagya South: 0 projectsAkatsi South: 0 projectsAtwima Mponua: 0 projectsAkatsi North: 0 projectsHo Municipal: 0 projectsAdansi South: 0 projectsHohoe Municipal: 0 projectsAdansi Asokwa: 0 projectsHo West: 0 projectsBosome Freho: 0 projectsAfadzato South: 0 projectsAhafo Ano South East: 0 projectsNorth Dayi: 0 projectsBekwai Municipal: 0 projectsKpando Municipal: 0 projectsBosomtwe: 0 projectsNorth Tongu: 0 projectsCentral Tongu: 0 projectsMampong Municipal: 0 projectsAjumako-enyan-essiam: 0 projectsGomoa West: 0 projectsAgona West Municipal: 0 projectsAgona East: 0 projectsAssin North: 0 projectsAssin South: 0 projectsAsikuma-odoben-brakwa: 0 projectsEffutu Municipal: 0 projectsGomoa East: 0 projectsAbura-asebu-kwamankese: 0 projectsJomoro: 0 projectsEllembelle: 0 projectsDormaa Municipal: 0 projectsDormaa West: 0 projectsNadowli-kaleo: 0 projectsPrestea/huni Valley: 0 projectsAhanta West Municipal: 0 projectsDaffiama Bussie Issa: 0 projectsNzema East: 0 projectsLawra: 0 projectsNandom: 0 projectsTarkwa Nsuaem: 0 projectsTalensi: 0 projectsSefwi Akontombra: 0 projectsEffia Kwesimintsim Municipal: 0 projectsNabdam: 0 projectsBuilsa South: 0 projectsBuilsa North: 0 projectsBinduri: 0 projectsPusiga: 0 projectsBawku Municipal: 0 projectsNorth Gonja: 0 projectsWest Gonja: 0 projectsMion: 0 projectsYendi Municipal: 0 projectsTolon: 0 projectsKumbungu: 0 projectsWest Mamprusi Municipal: 0 projectsMamprugu Moagduri: 0 projectsZabzugu: 0 projectsTatale Sanguli: 0 projectsSene East: 0 projectsBibiani-anhwiaso-bekwai Municipal: 0 projectsSene West: 0 projectsUpper Denkyira East Municipal: 0 projectsAsutifi North: 0 projectsAhafo Ano North: 0 projectsAmansie Central: 0 projectsAmansie West: 0 projectsAsutifi South: 0 projectsTechiman Municipal: 0 projectsUpper Denkyira West: 0 projectsTechiman North: 0 projectsCape Coast Metropolitan: 0 projectsKomenda-edina-eguafo-abirem Municipal: 0 projectsBanda: 0 projectsSefwi-wiawso: 0 projectsJaman North: 0 projectsAsunafo South: 0 projectsTain: 0 projectsNkoranza South: 0 projectsSekyere Kumawu: 0 projectsBole: 0 projectsSekyere Afram Plains North: 0 projectsAsante Akim North: 0 projectsAsante Akim Central Municipal: 0 projectsKintampo North Municipal: 0 projectsAsokore Mampong Municipal: 0 projectsAtebubu Amantin: 0 projectsKwadaso Municipal: 0 projectsKpandai: 0 projectsEjisu Municipal: 0 projectsNkwanta North: 0 projectsBiakoye: 0 projectsWassa Amenfi East: 0 projectsCentral Gonja: 0 projectsTema West Municipal: 0 projectsAshaiman Municipal: 0 projectsPru East: 0 projectsKpone Katamanso: 1 projectSavelugu: 0 projectsTamale Metropolitan: 0 projectsSagnerigu: 0 projectsKaraga: 0 projectsNorth East Gonja: 0 projectsSouth Dayi: 0 projectsTempane: 0 projectsBolga East: 0 projectsYunyoo-nasuan: 0 projectsNanton: 0 projectsAssin Fosu: 0 projectsGomoa Central: 0 projectsPru West: 0 projectsBerekum West: 0 projectsAhafo Ano South West: 0 projectsAmansie South: 0 projectsAtwima Nwabiagya North: 0 projectsAdansi Akrofuom: 0 projectsAdansi North: 0 projectsObuasi East: 0 projectsAfigya Kwabre North: 0 projectsKumasi Metropolitan: 0 projectsOforikrom Municipal: 0 projectsAsokwa Municipal: 0 projectsOld Tafo Municipal: 0 projectsSuame Municipal: 0 projectsJuaben Municipal: 0 projectsAblekuma Central Municipal: 0 projectsKorle Klottey Municipal: 0 projectsAblekuma North Municipal: 0 projectsAyawaso North Municipal: 0 projectsAyawaso East Municipal: 0 projectsOkaikwei North Municipal: 0 projectsGa North Municipal: 0 projectsWeija Gbawe Municipal: 1 projectKrowor Municipal: 0 projectsTema Metropolitan: 0 projectsEast Gonja Municipal: 0 projectsAblekuma West Municipal: 0 projectsAyawaso Central Municipal: 0 projectsAccra Metropolis: 0 projectsAnloga: 0 projectsSekondi Takoradi Metropolis: 0 projectsKwahu South: 0 projectsAsene Akroso Manso: 0 projectsUpper Manya: 0 projectsAchiase: 0 projectsOkere: 0 projectsYilo Krobo: 0 projectsAtiwa West: 0 projectsNew Juaben North Municipal: 0 projectsFanteakwa North: 0 projectsBirim North: 0 projectsAsuogyaman: 0 projectsKwahu East: 0 projectsKwahu West: 0 projectsLower Manya: 0 projectsNsawam Adoagyiri: 0 projectsAkwapem South: 0 projectsDenkyembour: 0 projectsKwaebibirem: 0 projectsKwahu Afram Plains South: 0 projectsKwahu Afram Plains North: 0 projectsSuhum Municipal: 0 projectsAyensuano: 0 projectsAbuakwa South: 0 projectsUpper West Akim: 0 projectsWest Akim: 0 projectsAkyem Mansa: 0 projectsAtiwa East: 0 projectsNew Juaben South Municipal: 0 projectsBirim South: 0 projectsAbuakwa North: 0 projectsAkwapem North: 0 projectsFanteakwa South: 0 projectsBirim Central Municipal: 0 projects

FewerMore (most: 1)

Not on the map: no district given (2).

Table
Projects by district
DistrictProjects
Kpone Katamanso1
Ningo/prampram1
Weija Gbawe Municipal1

Source: Ghana's unfinished public projects, release 2026-11-14 (as of 2026-11-14), CC BY 4.0.

Boundaries: geoBoundaries (William & Mary geoLab), from USAID Ghana HPNO and the Ghana Statistical Service, CC BY 4.0; the release's districts are at the 2019 vintage.